
Industrial· Sriperumbudur, TN· 2022
Logistics Hub Warehouse
A 120,000 sq. ft. distribution warehouse with high-bay racking and dedicated dock yard.
Project overview
A national logistics client needed a distribution hub built to support high-bay racking and heavy daily truck turnover, on a plot near the Sriperumbudur industrial corridor.
Scope
- Pre-engineered steel structure sized for high-bay racking
- Heavy-duty RCC flooring rated for reach-truck loads
- 18-bay dock yard with levelers and canopy
- Fire hydrant network and compliance sign-off
Handed over in 11 months, fully compliant with fire and safety norms from day one.


Ready to secure your architectural legacy?
Get a free, no-obligation quote from our team. We respond within one business day.
